[Schematic] T2 & T2,T1 Air units

Views: 92
schematic preview
0

Atrax, Mace ground units (T2)

All T1 and T2 air units.

You'll need a lot of coal and sand. Remember to introduce the correct resource in each conveyor.

copper1966lead1598silicon520
positive power icon+360negative power icon-1272